It should be noted that on the SS527 Bustese, there is an alternating one-way traffic due to work in progress. This change to the traffic system will be active from 9.00pm on 15 July to 06.00am on 16 July 2026 in the stretch between the Varedo Crossroads and the SS35 Dei Giovi Crossroads.

To ensure maximum safety when traveling through this area, motorists are advised to:

  • Pay attention to temporary signs
  • Keep a safe distance from vehicles in front
  • Reduce speed in the construction zone
  • Be ready to stop if necessary

We recommend, where possible, planning alternative routes to avoid any delays.



(source: cciss ; image for illustrative or stock purposes)