On the SS148 Pontina there are works that will involve a reduction of the roadway. The intervention will begin at 00:00 on 13 July 2026 and will end at 11.59pm on 29 June 2029. The reduction extends between the Via Cristoforo Colombo Crossroads and the Terracina Crossroads - SS7 Appia.
This situation requires attention from motorists, as it could cause traffic slowdowns and congestion in the affected area. We therefore recommend:
-
Plan your journeys in advance, preferring alternative routes when possible.
-
Pay attention to the temporary signs and safety devices present on the construction site.
-
Maintain a safe distance from the vehicle in front, considering possible slowdowns.
Road safety is paramount, so it is important to adapt to changes in traffic conditions during the work period.
(source: cciss ; image for illustrative or archive purposes)
