From today, on the Strada Statale 527 Bustese, work is underway which involves a reduction of the roadway. During this intervention, the circulation of vehicles weighing more than 44 tons is prohibited.

These restrictions will be in force from 00:01 on 13 May 2025 until 11.59pm on 13 May 2026, in the stretch between the Mombello Crossroads and the Solaro Crossroads.

All motorists are advised to pay attention to the signs and respect the instructions provided to ensure the safety of all road users. It is advisable, if possible, to use alternative routes to avoid slowdowns and congestion.

Details:

  • Road: SS527 Bustese
  • Type of intervention: Work in progress
  • Lane reduction: Yes
  • Circulation ban: Vehicles over 44 tonnes
  • Validity period: 13 May 2025 - 13 May 2026
  • Sect affected: Between Incrocio Mombello and Incrocio Solaro


(source: cciss ; image for illustrative or stock purposes)