It should be noted that the SS131D-CNT in the Central Directorate Nuorese will be implemented a exchange of roadway due to ongoing works. This modification of the viability will take effect from the 07:00 on 26 May 2025 up to the 17:00 on 31 July 2025 .

The points affected by the intervention range from the intersection of P.Te Molinos - SS128 Sardinian central up to the Nuoro crossroads/ss389 crossing of the correct . It is essential to pay attention to road signals and the indications provided by the operators, to ensure the safety of all road users.

Details:

  • Strada : SS131D-CN (Nuorese Central Directorate)
  • type of intervention : exchange of roadway
  • Start of works : May 26, 2025, 07:00
  • End of work : 31 July 2025, 17:00
  • section involved :
  • P.Te Molinos - SS128 Central Sardinian intersection
  • Nuoro crossroads/SS389 crossing of the correct

It is recommended to all motorists of driving with caution near the construction site and to respect the speed limits to ensure their own and others safety.



(source: CCISS; image for illustrative or repertoire purposes)